OTTO JUNKER News / Volume 19 - June 2011
Innovation
- Statement of the Management
- Foundry seminar for graduate and dorctorate students
- Inauguration ceremony marks the launch of a new sintering plant for melting furnaces
- OTTO-JUNKER Awards 2010 prizegiving ceremony
Technology
- Trade Fair Preview GIFA/THERMPROCESS 2011, our key exhibits and innovations
Cast Iron & Steel
- New current orders
- Powerful OTTO JUNKER corless induction furnace at GIFA special show focussing on energy efficiency
Light metal
- New pusher furnace system for EGYPTALUM (Egypt)
- More chamber furnaces ordered by long-standing customers
Copper
- Strip processing line for OCM KIROV (Russia) - successful start-up of the certified system
High Grade Steel Foundry
- Major investments for the foundry in Lammersdorf on the point of completion - New workshop ventilation system with integrated heat recovery plus expansion of mechanical machining capabilities
OTTO JUNKER News / Volume 18 - October 2010
- Statement of the Management
- Mr. Atilla Somuncu joins OTTO JUNKER GmbH as new General Manager for the Thermoprocessing Plants Business Unit
- "Open Day" at JUNKER Industrial Equipment s.r.o. in the Czech Republic a full Success
- Internet relaunch
- Equipment installation is the key final phase in the order handling process
- Stronger foothold in Belarusian market
- Market leadership strengthened in Poland
- 10 steel melting furnaces for the Middle East
- Melting fine-grained materials - new applications for indctive melting
- SLE Pusher Furnace (Side Loaded Engergy Saving Pusher Furnace) - A new generation pusher furnace for re-heating and homogenizing aluminium slabs
- New order for a multi-purpose roller hearth furnace for bright annealing DHP copper tubing from Termomecanica, Sao Paulo/Brazil
- INDUGA low-pressure die casting lines in use worldwide - Interesting orders from India, China and Brazil
- Extensive investment in emission control and compliance with maximum workplace concentrations improves efficiency and further stregthens our Lammersdorf operations
- Committed to vocational training
OTTO JUNKER News / Volume 17 - March 2010
-
Statement of the Management
-
Trade fairs and conventions in the first half of 2010
-
New CFO at OTTO JUNKER
-
Award of honorary freemanship of the RWTH and of Otto Junker prizes 2009
-
Orders from Sweden
-
Melting furnace system for ENERCON's new foundry successfully commissioned
-
Second pusher furnace for TLM (Croatia)
-
Pictures of aluminium extrusion works equipment under shop assembly
-
Successful commissioning of a reflow furnace at Minchali/Taiwan
-
HCC pressurized pouring furnace for Nippon Shindo (Japan)
-
INDUGA channel melting furnace for DHP copper
-
Improved AlpHaSet moulding sand binder system provides ecological and technological advantages - Hüttenes-Albertus cooperates successfully with OTTO JUNKER
-
From old to new! Successful upgrade saves time and money
OTTO JUNKER News / Volume 16 - July 2009
-
Statement of the Management
-
Uwe Zulehner - new Managing Director of INDUGA
-
Innovative strip flotation furnace - optimization based on numeric and physical flow simulation
-
Successful long-term cooperation with RWTH Aachen's Institute of Industrial Furnace Engineering (IOB)
-
Use of numeric simulation to prevent molten metal splatter in coreless induction furnaces
-
Newly founded Zeitzer Guss GmbH uses OTTO JUNKER melting equipment
-
One more OTTO JUNKER system for ELVAL
-
Lambda control - active fuel control for billet heaters saves energy and the environment
-
Assuring the safety of controlled atmospheres - continuous strip annealing lines with controlled atmospheres containing up to 25 % H2
-
INDUGA to supply brass pouring furnace
-
Numerical simulation - the modern tool of foundry operators
-
Many years of experience plus advanced simulation methods ensure success
OTTO JUNKER News / Volume 15 - January 2009
-
Statement of the Management
-
Aluminium Trade Fair 2008 - Participation was a success
-
Third 6-m vertical turning and boring mill commissioned
-
Joint energy-saving project pursued by two companies from the Aachen region
-
Presentation of OTTO JUNKER Awards
-
OTTO JUNKER 40-tonne melting plant for casting wind power plant components
-
Eisenwerke Fried. Wilh. Düker GmbH & Co. KGaA - Solemn commissioning of new melting plant
-
Dual recuperation saves energy, boosts efficiency and protects the environment - a new approach to strip annealing
-
OTTO JUNKER modernizes aluminium extrusion works
-
New ETP copper line for Oriental Copper/ Thailand
-
Continuous strip annealing lines - Further orders from China and other countries
-
Use of double-walled pouring ladles brings decisive benefits - a successful joint development
-
OTTO JUNKER technology for renewable energy
OTTO JUNKER News / Volume 14 - September 2008
-
Welcoming words by Dr. Rinnhofer
-
Dr. Rinnhofer chairman of the board
-
Thai customers' Day
-
OTTO JUNKER extrusion in ET 2008
-
"Frost Proof" patented water recooling technology
-
Energy-efficient billet heater plant
-
Saving Energy at tilt rotary furnace
-
OTTO JUNKER to supply a large-scale MF furnace plant for a steelmaking customer
-
100th IGBT converter
-
NEW: The first ever continuously operated low-pressure casting furnace
-
OTTO JUNKER to provide largest-ever coreless medium-frequency induction furnace for aluminium
-
Roller hearth furnace for homogenizing and annealing aluminium strip coils
-
Annealing of heavy-gauge strip at high temperatures - innovative modernization of a strip treatment line
-
Our trademark: innovative and energy-efficient equipment technology










